Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13672535
| No.13672535
- Product Categories
- Friendly Links
- home > Supply > Fujian Slope Protection Network Factory, Fujian slope protection net factory, Fujian Slope Protection Network manufacturers
Fujian Slope Protection Network Factory, Fujian slope protection net factory, Fujian Slope Protection Network manufacturers
| Information Name: | Fujian Slope Protection Network Factory, Fujian slope protection net factory, Fujian Slope Protection Network manufacturers |
| Published: | 2015-07-01 |
| Validity: | 30000000 |
| Specifications: | 4 * 4 |
| Quantity: | 1000.00 |
| Price Description: | |
| Detailed Product Description: | Slope Protection Network Features with high flexibility, high protection strength, easy spreadability. Adapt to any slope terrain, the installation program standardization and systematization. The system uses die of installation, short construction period, low construction costs. Special manufacturing processes and materials of high corrosion preventive technology systems, determines the ultra-life system. Systems engineering team can impact on the environment to a minimum, the protection area can be adequately protected soil, rock solid, easy to artificial green, environmentally friendly. Similar to the spray anchor and soil nailing walls and other surface slope system acts on principle, but because of the flexible features enable the system to be locally concentrated load is surrounded by material: steel wire rope, ordinary steel wire mesh (often called wire grille) and TECCO high strength steel wire mesh uniform transfer to full protection of the whole system, ie locally under load, the overall effect, so that the system can withstand greater load and reduce single bolt anchoring force requirements. Open Slope Protection Network Usage system, ground water can drain freely, avoiding the slope instability problems due to the pressure caused by rising groundwater; this system in addition to the stability of the slope has some contributions, while suppressing side Poe suffered further weathering and erosion, and on the slope morphology no special requirements, do not destroy and change the slope of the original landform and vegetation growth conditions, its open characteristics to subsequent or conditional green artificial slope and implement retention time required in the future the necessary conditions for green plants grow freely in its open space, the role of the solid earth and slope protection plant root system became one, thus inhibiting the slope damage and soil erosion, which in turn protects the topography and slope vegetation, slope protection and achieve the best environmental protection purposes. Common Type: System support rope wire rope anchor + + suture rope, opening the pit + tension [or edge (along) anchorage (cable anchor 2-4m distance 4.5m) + vertical and horizontal support rope (∮12- ∮16) + wire rope (◇ 08/300/4 * 4 m) + suture rope (∮8)] Active Protection Network main models: GAR1, GAR2, GPS1, GPS2 and so on. Slope protection network installation steps (1) SNS slope flexible protection network installation steps in the design and the actual site topography and anchor steel columns based on measurements positioning. Site discharge line length should be more than the design of the system length of about 3 to 8% of undulating terrain, system layout along the same contours difficult to take maximum linear arrangement (8%); relatively flat terrain rules, the system can be arranged Basically Remove (3%) in the same contour arranged along a straight line; On this basis, promising design spacing column spacing can be shortened or widened 20% adjustment range. (2) Excavation (not thick overlay of local, when the excavation to bedrock and has not yet reached the design depth, the position of the anchor hole in the pit of drilling bolt holes, to be inserted into the rock bolt and the upper base of concrete grouting after reperfusion). (3) and perfusion basis of concrete embedded anchor (for rock foundation, 2,3 step should be to drill bolt holes and bolt installation, on the concrete foundation, also on the basis of concrete drilling perfusion after installation bolt). (4) Base mounting: the base set into the bolt with nut tightened. (5) steel columns and a pull-anchor strap attaching (6) side of the anchor rope of installation: anchor rope as above, but in the pull-anchor strap attaching good after. (7) on the support strap attaching (8) under the support strap attaching (9) the installation of steel rope (10) wire rope grid installation Inquiry - Contact: Zhang 134-8370-0870 Website: http: // www.bianpowang.cn |
Admin>>>
You are the 6224 visitor
Copyright © GuangDong ICP No. 10089450, Wire Mesh Products Co., Ltd. Hebei Jiage All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 6224 visitor
Copyright © GuangDong ICP No. 10089450, Wire Mesh Products Co., Ltd. Hebei Jiage All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

